ADVERTISEMENT FOR BIDS
City of Flaxton, North Dakota
Flaxton Lead Service
Line Determination
NOTICE IS HEREBY GIVEN that
the City of Flaxton, North Dakota will
receive sealed Bids for the
construction of LEAD SERVICE
LINE DETERMINATION at
Ackerman-Estvold, 1907 17th Street
SE, Minot, North Dakota,until 10:30
AM Monday, December 6, 2021.
All Bids must be submitted, and all
work shall be done, in full and strict
compliance with:
1. The Plans & Contract Documents
for this project;
2. Any Special Conditions for this
project;
Project bidding documents are available
for examination and/or $100
purchase Monday through Friday
from 8:00 am to 12:00 pm and 1:00
pm to 5:00 pm at the office of
Ackerman-Estvold, 1907 17th Street
SE,
Minot ND 58701. Complete digital
project bidding documents are available
at
www.ackermanestvold.com/projects
or www.questcdn.com. You may
download the digital plan documents
for $50 by inputting Quest project
#8066779 on the website’ s Project
Search page. Please contact
QuestCDN.com at 952-233-1632or
info@questcdn.com for assistance
in free membership registration,
downloading, and working with this
digital project information. Potential
bidders may contact
Ackerman-Estvold at (701)
837-8737 with any questions.
Generally, the Work covered by the
Plans and Specifications for the
Lead Service Determination project
will consist of the materials, labor,
tools, and equipment required to
verify and document the pipe
material of 73 service lines by
hydrovac excavation within 2′ on
each side of the existing curb stops.
All work shall conform to AWWA
C810-17 Replacement and Flushing
of Lead Service Lines Standard. All
excavation will be backfilled as indicated
on drawings and specification.
The work shall have a final
completion date of July 1, 2022.
All Bids are to be submitted on the
basis of cash payment for the Work
and Materials necessary to complete
the project. Each bid must be accompanied
by a separate envelope
containing the contractor’ s license
and bid security. The bid security
must be in a sum equal to five percent
of the full amount of the bid and
must be in the form of a bidder’ s
bond. A bidder’ s bond must be executed
by the bidder as principal and
by a surety, conditioned that if the
principal’ s bid is accepted and the
contract awarded to the principal,
the principal, within ten days after
notice of the award, shall execute a
contract in accordance with the
terms of the bid and the bid bond
and any condition of the governing
body. A countersignature of a bid
bond is not required under this section.
If a successful bidder does not
execute a contract within the ten
days allowed, the bidder’ s bond
must be forfeited to the Owner and
the project awarded to the next
lowest responsible bidder. Bidders
must be licensed for the full amount
of the bid as required by section
43-07-12 of the North Dakota Century
Code.
Bidders on this work will be required
to comply with Title 40 CFR Part 33-
Participation by Disadvantaged
Business Enterprises in the United
States Environmental Protection
Agency Programs. The requirements
for bidders and contractors
under this regulation concern utilization
of Minority Business Enterprises
(MBE), Women’ s Business Enterprises
(WBE), and Small Business
Enterprises (SBE) and are explained
in the specifications.
The goal for MBE is 2% of the total
dollar value of the project. The goal
for WBE is 3% of the total dollar
value of the project.
Bidders shall demonstrate a good
faith effort to solicit for MBE and
WBE subcontractors. The completed
MBE/WBE Solicitation Information
sheet must be provided in the outer
bid security envelope. Failure to
include this information will result in
the bid not being opened. No Bid
may be read or considered if it does
not fully comply with the requirements
of Section 48-01.2-05 of the
North Dakota Century Code.
Bidders on this work will be required
to comply with the President’ s
Executive Order No. 11246, as
amended.
The requirements for bidders and
contractors under this order are explained
in the specifications.
The Owner reserves the right to hold
all Bids for 45 days, to reject any or
all Bids, to waive any informality
or irregularity in any Bid, to accept
the Bid deemed in the best interest
of the Owner, and to rebid the
project until a satisfactory bid is
received.
There shall be endorsed upon the
outside of the envelope containing
the Bid, the following:
1. “City of Flaxton, North Dakota,
Lead Service Line Determination”
2. The name of the person, firm, corporation,
or joint venture submitting
the Bid.
3. The Bidder’ s Contractor’ s
L i c e n s e
or Contractor’ s License Renewal
Number.
4. Acknowledgement of the
Addenda, if any.
Any deficient Bid received will be
resealed and returned to the Bidder
immediately.
All work shall be substantially complete
by June 15, 2022. All work
shall be completed and ready for final
payment in accordance with the
General Conditions within 60
calendar days of the substantial
completion dates.
Should the Contractor fail to complete
its obligations under the Contract
within the time required herein
or within such extra time as may
have been granted by formal extensions
of time approved by the Owner,
there will be deducted from any
amount due to the Contractor the
sum of $500 per day for each and
every calendar day that the completion
of the Work is delayed. The
Contractor and his Surety will be
liable for any excess. Such payment
will be as and for liquidated
damages and not as a penalty.
By order of the City Council of the
City of Flaxton, North Dakota.
Dated this 2nd day of November,
2021.
Amy Ones,
City Auditor
(November 17-24,
December 1, 2021)
ADVERTISEMENT FOR BIDS
SOURIS RIVER JOINT WATER
RESOURCES BOARD
MOUSE RIVER ENHANCED
FLOOD PROTECTION PROJECT
PHASE WC-1B Tierrecita Vallejo
WARD COUNTY, NORTH DAKOTA
NOTICE IS HEREBY GIVEN that
the Souris River Joint Water
Resources Board will receive sealed
Bids for the construction of the
Mouse River Enhanced Flood Protection
Project Phase WC-1B Tierrecita
Vallejo, at Minot City Hall in the
Council Chambers, 515 2nd Avenue
Southwest, Minot, North Dakota
58702 until 10:00 AM CST, Tuesday
December 21, 2021, at which time
all Bids will be publicly opened and
read aloud.
All Bids must be submitted, and all
work shall be done, in full and strict
compliance with the Plans and
Specifications for this Project.
Complete digital project bidding
documents are available at
www.questcdn.com. You may download
the digital plan documents for
$100 by inputting Quest Project
#8072095 on the website’ s Project
Search page. Please contact
QuestCDN.com at (952) 233-1632
or info@questcdn.com for assistance
in a free membership registration,
downloading, and working with
this digital project information. An
optional paper set of project documents
is also available for a nonrefundable
price of $500 per set. Make
checks payable to Barr Engineering
Co. and send to 234 West Century
Avenue Bismarck, ND 58503. Potential
bidders may contact Barr Engineering
Co. at 800-632-2277 with
any questions. Copies of the documents
are available for viewing at
the following locations during normal
business hours, Monday through Friday,
excluding holidays:
Barr Engineering Co.: 234 West
Century Avenue, Bismarck, ND
Barr Engineering Co.: 4300 Market-
Pointe Drive, Minneapolis, MN
Ackerman-Estvold Engineering:
1907 17th Street SE, Minot, ND
A voluntary pre-bid conference for
interested bidders will be held on
November 30, 2021. Any
companies/teams/joint ventures
planning to submit a bid are encouraged
to have at least one
representative present at the voluntary
pre-Bid conference. The conference
will be hosted on Microsoft
Teams from 10:00 am CST until
11:00 am CST.
Microsoft Teams Link:
ht tps: / / teams.microsof t .com/ l /
me e t u p – j o i n / 1 9%3 ame e t i n g _
MmI4NmZmZWItNGNiMS00MDlh
LThlMDctODkzNWQ4ZWVjMGY
3%40thread.v2/0?context=%7b%
22Tid%22%3a%226387987d-
5768-43fc-aaa8-da5303dcc6ed%
22%2c%22Oid%22%3a%22b005
8787-897e-4190-a6c5-d223fde771
a2%22%7d
Call in (audio only): (833) 450-1894
United States (Toll-free)
Phone Conference ID: 244 80 835#
The public bid opening will be held
at Minot City Hall on December 21,
2021. The bid opening will be hosted
on Microsoft Teams from 10:00 am
CST until 11:00 am CST.
Microsoft Teams Link:
ht tps: / / teams.microsof t .com/ l /
me e t u p – j o i n / 1 9%3 ame e t i n g _
Mjg1OGM0ODMtMjdmNC00NDM3
LWJkMzYtOGY1MDdiOTBiZjQ0%
40thread.v2/0?context=%7b%22
Tid%22%3a%226387987d-5768-
43fc-aaa8-da5303dcc6ed%22%2c
%22Oid%22%3a%22b0058787-89
7e-4190-a6c5-d223fde771a2%22
%7d
Call in (audio only): (833) 450-1894
United States (Toll-free)
Phone Conference ID: 979 176 603#
In general, the Work included in the
Project includes the labor, materials,
tools, and equipment required to
construct MREFPP Phase WC-1B
Tierrecita Vallejo as fully depicted in
the Drawings and Technical Specifications
for the Project. The project is
located within Ward County, North
Dakota.
All Bids are to be submitted on the
basis of cash payment for the Work,
and are to be enclosed in a sealed
envelope addressed to the undersigned
Chairman, endorsed as required
below. Each bid must be accompanied
by a separate envelope
containing the contractor’ s license
and bid security. The bid security
must be in a sum equal to five percent
(5%) of the full amount of the
Bid and must be in the form of a
bidder’ s bond. A bidder’ s bond
m u s t
be executed by the bidder as principal
and by a surety, conditioned that
if the principal’ s bid is accepted and
the contract awarded to the principal,
the principal, within ten days
after notice of the award, shall execute
a contract in accordance with
the terms of the Bid and the bid
bond and any condition of the
governing body. A countersignature
of a bid bond is not required. If a
successful bidder does not execute
a contract within the ten days allowed,
the bidder’ s bond must be
forfeited to the governing body and
the project awarded to the next
lowest responsible bidder. The
bidder must be licensed for the full
amount of the bid as required by
Section 43-07-12 of the North Dakota
Century Code.
The outside of the sealed envelope
containing the bid and other required
items shall be endorsed with the following
verbiage:
1. ” Souris River Joint Water
Resource Board, Mouse River
Enhanced Flood Protection Project,
Phase WC-1B Tierrecita Vallejo”
2. The name of the person, firm, corporation,
or joint venture submitting
the Bid.
3. The Bidder’ s Contractor’ s
L i c e n s e
or Contractor’ s License Renewal
Number.
4. Acknowledgement of Addenda.
No Bid may be read or considered if
it does not fully comply with the requirements
of Section 48-01.2-05 of
the North Dakota Century Code. Any
deficient Bid received will be
resealed and returned to the Bidder
immediately.
The Owner reserves the right to hold
all bids for 75 days, to reject any or
all Bids and to waive any informality
or irregularity in any Bid and to accept
the Bid deemed in the best interest
of the Owner. The Owner
reserves the right to rebid the project
until a satisfactory Bid is received.
The Work shall be substantially
complete by October 28, 2022. All
Work shall be complete and ready
for final payment in accordance with
the General Conditions by November
30, 2022.
Should the Contractor fail to complete
its obligations under the Contract
within the time required herein
or within such extra time as may
have been granted by formal extensions
of time approved by the Owner,
there will be deducted from any
amount due to the Contractor the
sum of $5,000.00 per day (with no
suspension for winter work) for each
and every calendar day that the substantial
or final completion of the
Work is delayed. The Contractor and
his Surety will be liable for any excess.
Such payment will be as and
for liquidated damages and not as a
penalty.
By order of the Souris River Joint
Water Resources Board,
Dated this November 18, 2021
Souris River Joint Water Resources
Board
David Ashley, Chairman
(November 24;
December 1-8,2021)
INVITATION NO: IFB 22-01
TOTAL CONSTRUCTION
INVITATION TO BID
BAS REPLACEMENT
Armed Forces Reserve Center
Wahpeton, North Dakota
An electronic bid dpository will be
utilized for bidding. All bidders must
create an account within
bidexpress.com in order to upload
their bids. REGISTRATION INSTRUCTIONS:
1.) https://bidexpress.com
2.) In top right hand corner, Click
“Register” button
3.) Complete “My Info”
4.) Click “Register” button
The bid depository (bidexpress.com)
will NOT accept bids submitted later
than 2:00 p.m. on December 9,
2021. Paper, faxed or emailed bids
will NOT be accepted. All technical
questions related to project specifications
and plans must be directed
to the project architect. The deadline
for receipt of technical questions is
no later than December 2, 2021.
A single bid will be accepted for Total
Construction, (IFB 22-01). All
modifications to bid prices must be
made by the individual bidder,
through the utilization of the elec-
P U B L II C N O T II C E S
tronic bid depository at
bidexpress.com. The OWNER is not
responsible for handling or overseeing
last minute modifications to bid
prices. Therefore, faxed or emailed
modifications to bid prices will NOT
be accepted by the OWNER.
Due to COVID 19, the bid opening
will not be open to the public. The
front gate entrance to Fraine Barracks
is closed to the general public.
The bids will be opened at 2:30 p.m.
on December 9, 2021. To listen to
the bid opening, you must call in using
the following ID and PIN
Number:
701-333-2840
ID No. 32076#
Pin No. 32076#
Bidding documents (specs and
plans) may be downloaded through
bidexpress.com or obtained through
local plan rooms. Specs and drawings
will not be available through the
OWNER. If bidders choose to download
through bidexpress.com, an account
must be created in order to
download the bidding documents. In
addition to downloading from ” Bid
Express” , the bidding documents are
on file at plan rooms and builder’ s
exchanges in the following North
Dakota locations: Bismarck; Dickinson,
Fargo, Grand Forks, Mandan,
Minot, Impact Procurement Technical
Assistance Center (Fargo) as
well as Rapid City, SD and the Min-
nesota Builders Exchange in Minneapolis,
Minnesota.
IMPORTANT: Davis-Bacon Wage
Rates are required for this project.
Each bid must be accompanied by a
bidder’ s bond made payable to The
Adjutant General, State of North
Dakota, and executed by the bidder
as principle and by a surety company
authorized to conduct business
in North Dakota, in a sum equal to
five percent (5%) of the bidder’ s
highest total bid combination, including
all add alternates to the bid
items; conditioned that if the bid is
accepted and the contract awarded,
the bidder within ten (10) business
days after notice of such award, will
effect and execute a contract in accordance
with the terms of their bid
and provide payment and performance
bonds as required by North
Dakota laws and regulations. A template
entitled ” AIA Document A310,
Bid Bond” , is provided within the
electronic project manual and should
be used to execute the bid guarantee.
In compliance with Section 43-07-12
of the North Dakota Century Code,
each contractor submitting a bid
must upload a copy of their North
Dakota Contractor’ s License or
c e r t i –
ficate of renewal issued by the ND
Secretary of State. Contractors must
be licensed for the highest amount
of their total bid combination including
add alternates; and their ND
Contractor’ s License must have
been in effect at least ten (10) days
prior to the date of the bid opening.
No bid will be read or considered
which does not fully comply with the
requirement herein for a bid bond
and a ND Contractor’ s License.
B o t h
documents must be uploaded to ” Bid
Express” as attachments to your bid.
A Certificate of Good Standing will
not be accepted in lieu of a North
Dakota Contractor’ s License. No exceptions
will be made to deficient
bids.
The OWNER reserves the right to
hold all legitimate bids for a period of
thirty (30) days following the date
fixed for the bid opening. It is the intent
of the OWNER to award a contract
to the lowest and best bidder.
The OWNER further reserves the
right to reject any and all bids and to
waive irregularities, and shall incur
no legal liability for the State of
North Dakota for the payment of any
funds until the contract is awarded
and approved by the proper authorities.
In compliance with Section
48-01.2-10 of the North Dakota Century
Code, the successful bidder
(awardee) shall be required to furnish
payment and performance
bonds covering the faithful performance
of the contract award and the
payment of all obligations
thereunder, and all additional obligations
required by the laws of the
State of North Dakota. Each payment
and performance bond shall be
in an amount equal to the full
amount of the contract award. Questions
may be directed to the Office of
the Adjutant General, Contract
Management Branch, Bismarck,
North Dakota, Telephone (701)
333-2068.
DATED: 15 November 2021
OFFICE OF THE ADJUTANT
GENERAL
Bismarck, North Dakota
By: /s/ JACKIE A. HUBER
Brigadier General, NDNG
Deputy Adjutant General
Contracting Officer
(November 17-24,
December 1,2021)
NOTICE OF HEARING
Probate No. 51-2021-PR-00194
IN THE DISTRICT COURT OF
WARD COUNTY, STATE OF
NORTH DAKOTA
In the Matter of the Estate of
Sharon Marsden, Deceased.
NOTICE IS HEREBY GIVEN that
the undersigned has been appointed
Personal Representative of the
above estate. All persons having
claims against the deceased are required
to present their claims within
three months, 90 days, after the date
of the first publication or mailing of
this notice or the claims will be forever
barred. Claims must either be
presented to Scott Allan Marsden,
Personal Representative of the
Estate of Sharon Marsden, in care of
Anthony Cooper of Boppre Law
Firm, PLLC, 2151 36th Ave SW,
Suite B, Minot, North Dakota 58701,
or filed with the Court.
Dated this ______ day of November,
2021.
Scott Allan Marsden, Personal
Representative
/s/Anthony Cooper
Anthony Cooper (#09252)
Boppre Law Firm, PLLC
2151 36th Ave SW, Suite B
Minot, ND 58701
Office: 701-852-5224
Fax: 701-852-5229
acooper@bopprelawfirm.com
Attorney for the Petitioner
(December 1-8-15, 2021)
NOTICE OF PUBLIC HEARING
The City Council of the City of Minot,
North Dakota, has scheduled a
public hearing for 5:30 p.m.,
Monday, December 6, 2021, in the
City Council Chambers located on
the second floor of City Hall (515
2nd Avenue SW), for the purpose of
considering three Renaissance Zone
applications submitted by Chad
Thompson for a 100% five-year
property tax exemption on
improvements located at 304 4th
Avenue , NW (The McHenry
Addition, Lot #1) by Dakota Apple
Partnership, Little Deep Pasta
Company LLC, and Smorbrod, LLC.
Any interested citizens are
encouraged to attend the meeting
and give comments on the
application.
Jonathan Rosenthal
Economic Development
Administrato
(December 1, 2021)
NOTICE TO CREDITORS
Case No. 51-2021-PR-00172
IN THE DISTRICT COURT OF
WARD COUNTY, STATE OF
NORTH DAKOTA
In the Matter of the Estate of
Richard Stansberry, a/k/a
Richard C. Stansberry, Deceased.
NOTICE IS HEREBY GIVEN that
the undersigned has been appointed
personal representative of the above
estate. All persons having claims
against the said deceased are required
to present their claims within
three (3) months after the date of the
first publication or mailing of this notice
or said claims will be forever
barred. Claims must either be
presented to Kenneth G. Stansberry,
personal representative of the
above-named estate, in care of
Louser & Zent, P.C., 1111 -31st
Avenue Southwest, Suite C, Minot,
North Dakota 58701, or filed with the
Court.
Dated this 15th day of November,
2021.
/s/Kenneth G. Stansberry
Kenneth G. Stansberry
1655 NW Eagle Bluff Ln.
Bremerton, WA 98311
Diane Louser, (ID #03882)
Louser & Zent, P.C.
1111-31st Avenue Southwest,
Suit C
Minot, ND 58701
Telephone No. (701) 837-4846
Attorneys for the Personal
Representative