Legal Notices 11-30
Public Notices
NOTICE OF EXECUTION SALE
Civil No. 51-2019-CV-01277
IN DISTRICT COURT, WARD
COUNTY, NORTH DAKOTA
NEWREZ LLC F/K/A NEW PENN
FINANCIAL, LLC D/B/A
SHELLPOINT MORTGAGE SER-
VICING,
Plaintiff,
vs.
JACKIE A. JOHNSON, et al,
Defendants.
NOTICE IS HEREBY GIVEN, that
by virtue of a judgment and decree
of foreclosure rendered and given in
the District Court in and for the
County of Ward, North Dakota,
North Central Judicial District, en-
tered and docketed in the Office of
the Clerk of said Court on October
08, 2019, in Ward County civil case
number 51-2019-CV-01277; on
which day it was adjudged that there
was due and owing the Plaintiff from
the Defendant, Jackie A. Johnson, a
single man and Kevin D. McKinstry,
a single man, together with costs
and disbursements of said action,
the sum of $100,307.32, and by vir-
tue of a Special execution issued to
me by the Clerk of said Court, I will
sell the real property described in
said judgment and hereafter
described to the highest bidder for
cash at public auction at the front
door of the Ward County
Courthouse,North Dakota, on Janu-
ary 08, 2020, at the hour of 10:00
AM(CT) of that dayto satisfy the
amount due with accrued costs and
interest at the date of sale, or so
much thereof as the proceeds of
said sale applicable thereto will
satisfy. The premises to be sold as
aforesaid are situated in the County
of Ward,State of North Dakota, and
are more particularly described as
follows:
LOT 1, BLOCK 2, BODIEN’S SUB-
DIVISION OF LOTS 4, 5, 6, 7, S1/2
8 AND S1/2 3, ALL IN BLOCK 3,
HOME ACRES ADDITION TO THE
CITY OF MINOT, WARD COUNTY,
NORTH DAKOTA
(Street Address: 1722 South Main
Street, Minot, ND 58701)
IN TESTIMONY WHEREOF, I have
hereunto set my hand and seal the
18th day of November, 2019.
For: Robert Roed
Sheriff of Ward County,
North Dakota
/s/Jamie Williams
By: Jamie Williams
Deputy Sheriff
Janelle G. Ewing
The Sayer Law Group, P.C.
Attorneys for Plaintiff
925 E. 4th St.
Waterloo, IA 50703
(319) 234-2530
Attorney ID No.: 08611
generalupdates@sayerlaw.com
File No. ND190039
(November 23-30; December 7,
2019)
NOTICE TO CREDITORS
PROBATE NO. 51-2019-PR-00156
IN THE COUNTY COURT OF
WARD COUNTY, STATE OF
NORTH DAKOTA
In the Matter of the Estate of
BARBARA KITTLESON, Deceased.
NOTICE IS HEREBY GIVEN that
the undersigned has been appointed
Personal Representative of the
above estate. All persons having
claims against the said deceased
are required to present their claims
within three months after the date of
the first publication or mailing of this
notice or said claims will be forever
barred. Claims must either be
presented to MATT ROLAND, 1370
Highway 43, Bottineau, ND 58318,
or filed with the Court.
Dated this 13th day of November,
2019.
/s/Matt Roland
Personal Representative
Matt Roland
MCINTEE LAW FIRM
Michael S. McIntee
116 West 5th Street
Bottineau, ND 58318
701-228-3624
Attorney for Personal Representa-
tives
(November 16-23-30, 2019)
NOTICE TO CREDITORS
Probate No. 51-2019-PR-167
IN THE DISTRICT COURT OF
WARD COUNTY, STATE OF
NORTH DAKOTA
In the Matter of the Estate of
Norris Heskin, Deceased.
NOTICE IS HEREBY GIVEN that
Lowell Heskin has been appointed
personal representative of the Estate
of Norris Heskin. All persons having
claims against Norris Heskin are re-
quired to present their claims within
three (3) months after the date of the
first publication of this notice or said
claims will be forever barred.
Claims must either be presented to
the Lowell Heskin, personal
representative of the estate, at P.O.
Box 998, Minot, ND 58702-0998, or
filed with the Court.
Dated this 25th day of November,
2019.
Lowell Heskin
Personal Representative
(November 30; December 7-14,
2019)
STATE OF NORTH DAKOTA
PUBLIC SERVICE COMMISSION
Northern States Power Company
Renewable Resource Cost
Recovery (2020)
Rates
Case No. PU-19-329
NOTICE OF OPPORTUNITY FOR
HEARING
November 21, 2019
On September 26, 2019, Northern
States Power Company (NSP) filed
a request for approval of its 2020
Renewable Energy Rider (RER).
The purpose of this rider is to recov-
er costs from NSP’s North Dakota
electric customers renewable energy
generation not presently reflected in
retail rates. In this filing, NSP would
recover costs of six previously ap-
proved projects and two new pro-
jects that are expected to be in ser-
vice in 2020. The RER rate would in-
crease from $0.001191 per kWh to
$0.002165 per kWh.
The 2020 RER rate would be ap-
plied to all energy billed to each cus-
tomer effective January 1, 2020. As
a result of the RER rate change, the
residential electrical customer con-
suming 750 kWh per month, the
monthly RER charge would be
$1.62, an increase of $0.73 per
month.
The issues to be considered in this
proceeding are:
1. Whether the investments and as-
sociated costs for the resources
qualify for recovery,
2. Whether the incurred costs are
reasonable and prudent, and
3. Whether the rate adjustments are
consistent with the terms of NSP’s
tariff.
Those interested are invited to com-
ment on the application in writing.
Persons desiring a hearing must file
a written request identifying their in-
terest in the proceeding and the rea-
sons for requesting a hearing. Com-
ments and requests for hearing must
be received by January 3, 2020. If
deemed appropriate, the Commis-
sion can determine the matter
without a hearing.
For more information contact the
Public Service Commission, State
Capitol, Bismarck, North Dakota
58505, 701-328-2400 or Relay North
Dakota 1-800-366-6888 TTY. If you
require any auxiliary aids or ser-
vices, such as readers, signers, or
Braille materials, please notify the
Commission 24 hours in advance.
PUBLIC SERVICE COMMISSION
Julie Fedorchak, Commissioner
Brian Kroshus, Chairman
Randy Christmann, Commissioner
(November 30, 2019)
STATE OF NORTH DAKOTA
PUBLIC SERVICE COMMISSION
Northern States Power Company
Transmission Facility Cost
Recovery (2020)
Rates
Case No. PU-19-328
NOTICE OF OPPORTUNITY FOR
HEARING
November 21, 2019
On September 27, 2019, Northern
States Power Company (NSP), dba
Xcel Energy, filed its 2020
Transmission Cost Recovery Rider
(TCR). The purpose this rider is to
recover costs from NSP’s North
Dakota electric customers for 48
previously approved transmission
projects and six new transmission
projects, as well as net expenses
from the Midcontinent Independent
System Operator (MISO) billings.
This proposal would increase the
TCR rate from $0.001914 per
kilowatt-hour (kWh) to $0.002870
per kWh.
The proposed 2020 TCR rate would
be applied to all energy billed to
each customer. As a result of the
TCR change, a residential electrical
customer consuming 750 kWh per
month would expect a $0.71 per
month billing increase.
The issues to be considered in this
proceeding are:
1. Whether the investments and as-
sociated costs for the new or modi-
fied electric transmission facilities
qualify for recovery,
2. Whether the incurred costs are
reasonable and prudent, and
3. Whether the rate adjustments are
consistent with the terms of NSP’s
tariff.
Those interested are invited to com-
ment on the application in writing.
Persons desiring a hearing must file
a written request identifying their in-
terest in the proceeding and the rea-
sons for requesting a hearing. Com-
ments and requests for hearing must
be received by January 3, 2020. If
deemed appropriate, the Commis-
sion can determine the matter
without a hearing.
For more information contact the
Public Service Commission, State
Capitol, Bismarck, North Dakota
58505, 701-328-2400 or Relay North
Dakota 1-800-366-6888 TTY. If you
require any auxiliary aids or ser-
vices, such as readers, signers, or
Braille materials, please notify the
Commission 24 hours in advance.
PUBLIC SERVICE COMMISSION
Julie Fedorchak, Commissioner
Brian Kroshus, Chairman
Randy Christmann, Commissioner
(November 30, 2019)